Date de publication: 2 juin 2017
Promoteur – Intermédiaire Financier
GRAND PORT MARITIME DE MARSEILLELieu
Description
Implementation of part of the Grand Port of Marseille's 2014-2018 strategic master plan
Objectifs
The project consists of an investment programme aiming to increase the capacity and improve the efficiency of the port of Marseille, in France, in line with the port master plan that is expected to be carried out between 2014 and 2018.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 50 million
Coût total (montant approximatif)
EUR 136 million
Aspects environnementaux
Compliance with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC, the Environmental Impact Assessment (EIA) Directive 2011/92/EU, the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC, the Water Framework Directive 2000/60/EC (as amended), the Floods Directive 2007/60/EC, as well as biodiversity assessment requirements, climate change adaptation issues, mitigation/compensation measures and environmental and social monitoring plans, will be assessed in detail during appraisal for each sub-project.
Passation des marchés
The promoter, GPMM, is a contracting entity within the meaning of Directive 2014/25/EU. The Bank will require the promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU or 2004/17/EC, where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Signé - 28/02/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).