Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140350
    Date de publication: 22 octobre 2014

    Promoteur – Intermédiaire Financier

    TRINITY COLLEGE DUBLIN

    Lieu

    Description

    Trinity College Dublin has set out a number of education initiatives over the coming years for a new Trinity business school, student accommodation, new wireless infrastructure and provision of a research and education centre (Institute of Population Health).

    Objectifs

    The main purpose of these projects is to construct new buildings for teaching, research and student accommodation facilities for Trinity College Dublin (TCD) in Ireland in the areas of business, student accommodation, wireless infrastructure and an Institute of Population Health. The aim is to increase the capacity and quality of teaching, learning and academic research as well as student accommodation at the university by expanding and developing the university facilities in these four areas. The main components of the project are construction of the new Trinity Business School on campus, development of additional student accommodation and other related student services and acquisition and fitting out of a centre for the Institute of Population Health. The ultimate beneficiaries are the College community, including students and staff of the university, as well as the eventual employers of the graduates and wider society in Ireland. The new buildings are designed to try to meet high energy-efficiency standards.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 70 million

    Coût total (montant approximatif)

    EUR 148 million

    Aspects environnementaux

    Universities and research institutions are not specifically mentioned in the directive on environmental impact assessment (EIA). An EIA is therefore not required in accordance with the EIA Directive 2011/92/EU. However, parts of the investment cover the construction of new facilities and therefore may be covered by Annex II of the directive in relation to urban development. The Bank’s services will verify during appraisal whether an EIA is required for any component of the project. Potential impacts on Natura 2000 conservation sites as well as operating procedures and systems related to animal testing, genetically modified organisms (GMOs), biosafety hazards and waste management will also be checked.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EEC or 2004/17/EEC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 25/06/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Irlande Éducation