Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140269
    Date de publication: 29 septembre 2014

    Promoteur – Intermédiaire Financier

    MINISTRY OF INFRASTRUCTURE AND DEVELOPMENT / GDDKIA

    Lieu

    Description

    Construction of 14 bypasses nation-wide .

    Objectifs

    The programme involves the new construction and upgrading of bypasses and existing roads (about 14 sub-projects in all) along national highways and some short sections of expressways, totalling 175 km. The investments are part of the Road Investment Programme for the years 2014 to 2020 and will be jointly financed by EU Cohesion Funds.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 515 million

    Coût total (montant approximatif)

    EUR 1290 million

    Aspects environnementaux

    As this is a programme of roads, compliance with the EU Strategic Environmental Assessment (SEA) Directive 2001/42/EC will be assessed during appraisal.
    Most of the schemes are expected to fall under Annex I of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), or to be screened under Annex II. It is expected that most of the individual schemes will require preparation of a full EIA with public consultation under the requirements of either Annex I or Annex II/III of the EIA Directive. In addition, the project has the potential to impact Natura 2000 sites, in which case compliance with the Habitats (92/43/EEC) and Birds Directives (79/409/EEC) would be assessed.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EC and Dir. 2004/17/EC, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 27/03/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports