Date de publication: 24 juillet 2014
Promoteur – Intermédiaire Financier
WEST YORKSHIRE COMBINED AUTHORITYLieu
Description
The project consists of an integrated package of road bypass, highway improvement and urban public transport schemes in West Yorkshire and York.
Objectifs
The project will contribute to developing a high quality, fully integrated, network of public transport links that will be a credible alternative to the car and providing good connectivity for local businesses.
Secteur(s)
- Transports - Transports et entreposage
- Services - Transports et entreposage
Montant BEI envisagé (montant approximatif)
GBP 100 million (EUR 128 million)
Coût total (montant approximatif)
GBP 293 million (EUR 374 million)
Aspects environnementaux
The project consists of a framework loan of multiple schemes that may be classes of development that fall under either Annex I or II of the EIA Directive 2011/92/EU. Whether the schemes were included in a plan or programme that was subject to strategic environmental assessment (Directive 2001/EC/EC) or whether the schemes impact an area forming part of the Natura 2000 network will be appraised. It is a requirement that all schemes are to be implemented in compliance with EU environmental legislation.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC or 2004/18/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where required. The procurement and contract strategy for the project and individual schemes will be determined.
Statut
Signé - 21/06/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).