Date de publication: 4 juin 2012
Promoteur – Intermédiaire Financier
ILIAD SALieu
Description
Roll-out of very high speed telecommunications networks throughout France, including roll-out in less densely populated areas of the country.
Objectifs
The project entails promoter’s investments into next generation fibre-based broadband infrastructures in France (Very-high-bit-rate digital subscriber line, VDSL and Fibre-to-the-Home, FTTH), including also less-densely-populated areas of the country, as well as into Asymmetric Digital Subscriber Line (ADSL) based broadband infrastructure.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 200 million
Coût total (montant approximatif)
EUR 447 million
Aspects environnementaux
Investments in fixed telecommunications projects (mainly civil works for fibre roll-out) do not fall under the EIA Directive 2011/92/EC. The related works have limited environmental effects, apart from disturbances during civil work constructions, which can be mitigated by appropriate measures. Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).
Passation des marchés
The promoter is a private company not operating in the Utilities sector, and is thus not covered by EU Directives on procurement.
Statut
Signé - 27/08/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).