Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100515
    Date de publication: 9 février 2011

    Promoteur – Intermédiaire Financier

    The General Directorate of State Railways Administration (TCDD)
    Mr. Mehmet TURŞAK
    Head of Research Planning & Coordination Department
    Talatpasa Bulvari 06330 Gar- Ankara Turkey
    Tel : +90 312 311 25 66
    Mobile : +90 505 467 03 44
    Fax : +90 312 310 40 84
    www.tcdd.gov.tr

    Lieu

    Description

    The rehabilitation of the Irmak-Zonguldak railway line which connects several ports on the Black Sea with Anatolia, particularly the capital Ankara.

    Objectifs

    To shift mainly freight road transportation to railways in order to alleviate the imbalance among transport modes, hence decreasing environmental repercussions of road transport and increasing safety.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 145 million

    Coût total (montant approximatif)

    EUR 370 million

    Aspects environnementaux

    The Project is aimed at rehabilitating and implementing a signalisation system for the 486 km Irmak - Karabük – Zonguldak Railway Line. The Project includes the complete renovation of the permanent way, substructure, bridges and culverts, the introduction of new telecommunication and signalling systems and changes to the track layout in some selected stations. Being a rehabilitation of a line along the existing alignment with no changes of the location of the permanent way, the project is expected to fall under Annex II of the relevant EC Directive and applicable Turkish legislation.

    Passation des marchés

    This is a project co-financed with IPA funds from the EC. Procurement of the works will be done in line with the relevant EC Directives and EIB Guide to procurement.

    Statut

    Signé - 4/07/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Turquie Transports