Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090526
    Date de publication: 2 novembre 2009

    Promoteur – Intermédiaire Financier

    The City of Belgrade.

    Contact:
    Mr Dragan DJILAS
    Mayor
    City of Belgrade
    Dragoslava Jovanovica 2
    Republic of Serbia
    Phone: +381 (11) 3229 785
    Fax: +381 (11) 3231 092

    Lieu

    Description

    The project includes new approach road sections from Toshin bunar (to the North of the Sava River) to Radnicka intersection (south of the Sava River), including the new cable stayed bridge over the Sava River providing an additional crossing point for traffic travelling between Novi Beograd and the central areas of Belgrade.

    Objectifs

    The project will enhance the transport network of the city contributing to alleviate its growing traffic and reduce congestion, pollution and noise in the inner city. It will address the exhausted capacities of bridges crossing the Sava River.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 160 million.

    Coût total (montant approximatif)

    EUR 360 million.

    Aspects environnementaux

    An equivalent project in the EU, would fall under Annex I of the EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC thus requiring a full EIA. During its appraisal the Bank will ensure compliance with its Environmental and Social policy and thus the principles of EU legislation.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the Project shall be tendered in accordance with the principles of the relevant applicable EU procurement legislation with parallel publication of tender notices in the EU Official Journal.

    Statut

    Signé - 18/12/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Serbie Transports