Date de publication: 16 décembre 2009
Promoteur – Intermédiaire Financier
Iberdrola, S.A.
Lieu
Description
The project comprises the construction and operation of a 103 MW wind farm that will consist of 120 turbines with a nameplate capacity of 850 kW. The project is located in the Municipality of Santa Domingo Ingenio, in the region of the Istmo de Tehuantepec, close to already existing wind farms La Ventosa and La Venta II.
Objectifs
The project will contribute to meet growing electricity demand using wind energy resources.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 78.50 million / USD 112.50 million
Coût total (montant approximatif)
EUR 157 million / USD 225 million
Aspects environnementaux
An EIA has been done and approved by the Ministry of Environment. The project appears not to have significant negative impacts and includes appropriate prevention, mitigation and compensation measures. The wind farm is situated along a bird migration corridor connecting to the US and Canada. The EIA and the permit conclude that the impact on birds and bats is considered acceptable, although conditional to an additional baseline survey and yearly monitoring to further refine impact assessment and define additional prevention and mitigation measures. In line with the Bank's guidelines, details of the environmental impact assessment, including adequacy of proposed mitigation, compensation and environmental monitoring will be analysed during appraisal, as well as the promoter's capacity and procedures to ensure compliance with environmental and biodiversity regulations.
Passation des marchés
The promoter is not subject to EU Procurement Directives. The promoter is a private company and is not operating on the basis of special or exclusive rights in the sense of EC directive 2004/17. In line with its principles and its statute, the Bank will however ensure that suitable procurement procedures, including an appropriate selection of works, goods and services offered at competitive prices, will be applied by the promoter and/or the special purpose companies. Details will be verified during appraisal.
Statut
Signé - 5/05/2010
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).