Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090387
    Date de publication: 12 novembre 2009

    Promoteur – Intermédiaire Financier

    The City of Zielona Gora

    Lieu

    Description

    The project considers a part financing of small and medium investment schemes in the City of Zielona Gora, relating mainly to the road infrastructure, cultural and recreational facilities.

    Objectifs

    The project is a multi-scheme multi-sector framework loan to finance the strategic investments of Zielona Gora, as included in the three-year rolling annex to the municipal budget. Schemes are expected to be in the fields of transport and local roads modernisation, enhancement of energy efficiency (street lighting and public buildings), education facilities, cultural and historical heritage, recreational infrastructure and public buildings rehabilitation.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to PLN 200 million (approximately EUR 47.3 million)

    Coût total (montant approximatif)

    The estimated cost of the project is PLN 611 million (approximately EUR 144.5 million).

    Aspects environnementaux

    The promoter will be required to implement this Framework Loan in compliance with EU environmental legislation. The Bank will request to be informed of the actions/decisions taken by the Promoter and the Competent Authorities on the necessity of undertaking an EIA and on the impact on biodiversity of the schemes to be financed. All the relevant projects’ key documents will be published in line with the Bank’s procedures.

    Passation des marchés

    EU Directives on procurement (2004/18/EC and 2004/17/EC) have been transposed into the national legislation. The Promoter will be required to organize the tenders in compliance with EU requirements. Application of EU procedures for the tender of contracts will be reviewed by the Bank’s services during appraisal, allocation and monitoring.

    Statut

    Signé - 23/04/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Aménagement urbain