Signature(s)
Fiche récapitulative
- Transports - Transportation and storage
Expansion of facilities at the Port of Cork's deep-water port in Ringaskiddy. The Port of Cork is a designated 'core' port under the TEN-T Guidelines and a 'Tier 1 Port of National Significance' under the Irish Government's National Ports Policy.
The main objective of the project is to enable the Port of Cork to build the necessary infrastructure to cater for future growth requirements and shipping trends towards larger vessels. The project will expand the capacity of the deep-water port at Ringaskiddy enabling the Port of Cork to relocate operations from the Upper Harbour, where the depth of the water channel and width of the river are significant constraints to the size and number of vessels that can access port facilities.
A strategic environment assessment (SEA) was undertaken in accordance with Directive 2001/42/EC by Cork County Council in 2014 as part of the Cork County Development Plan. This SEA formed the basis for the development objectives for the Ringaskiddy project. The SEA recommended the Ringaskiddy site as the preferred location for relocation of port facilities from sites in the inner harbour near the City of Cork. An environmental impact assessment (EIA) in accordance with Directive 2011/92/EU was undertaken for the project by the promoter, the Port of Cork Company (POCC). A Natura impact statement was prepared and an appropriate assessment was undertaken in accordance with the Habitats Directive 92/43/EEC and the Birds Directive 79/409/EEC. The proposed project works do not lie within any Natura 2000 designation area, but they are in close proximity to a number of sites. The appropriate assessment concluded that the proposed project with the implementation of the prescribed mitigation measures would not give rise to significant impact, either individually or in combination with other plans and projects, in a manner which would adversely affect the integrity of any designated site within the Natura 2000 network. A significant level of consultation took place with statutory consultees and relevant bodies as part of the development of the Ringaskiddy Port Redevelopment proposals. A programme of public consultation concerning the Ringaskiddy Port Redevelopment project was also undertaken in April 2013 and February 2014 to seek the views of the wider public on the proposal.
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
À la une
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes