Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20250653
Date de publication: 25 février 2026

Promoteur – Intermédiaire Financier

GALLIVARE KOMMUN

Lieu

Description

The project involves the construction of a multi-activity centre designed to provide cultural and sports facilities for the benefit of the wider local community. It will serve different generations and cater to a broad range of interests. The planned investments include cultural facilities such as a library, cinema, drama and music studios; a multi-purpose hall for various sports activities; swimming pools; leisure and activity areas; as well as a restaurant and office spaces. The project forms part of a comprehensive urban regeneration programme. Three phases have already been completed, and the current project constitutes the fourth phase.

Objectifs

The aim is to further support the revitalisation of the urban centre and contribute to enhancing the quality, functionality, and attractiveness of the built environment.

Secteur(s)

Montant BEI envisagé (montant approximatif)

SEK 1150 million (EUR 108 million)

Coût total (montant approximatif)

SEK 2300 million (EUR 215 million)

Aspects environnementaux

Where and if applicable, and based on a risk-based approach as defined in the EIBG E&S Policy, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Information on awarded main suppliers/contractors for the implementation of the envisaged operation is not available.

Statut

À l'examen - 4/11/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Suède Aménagement urbain