Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20250516
Date de publication: 29 août 2025

Promoteur – Intermédiaire Financier

COMUNE DI NAPOLI

Lieu

Description

Framework Loan to co-finance multi-sector schemes supporting Urban Development and Climate Strategies.

Objectifs

The Project is structured as a multi-sector municipal Framework Loan (FL) to support selected, eligible investments, or schemes, from the multi-annual and multi-scheme investment plan of Naples, supporting the city in the implementation of its urban development and climate strategies. The Project will include, among others, the construction, upgrade or refurbishment of public infrastructure, comprising, among others, the following eligible sectors: open spaces and green areas, climate adaptation, sustainable mobility, energy efficiency (EE), cultural facilities, as well as investments in social facilities (e.g., shelters, etc.).

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 45 million

Coût total (montant approximatif)

EUR 90 million

Aspects environnementaux

The Project will be implemented in line with the requirements of the applicable environmental legislation, mainly: EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC, Birds Directive 2009/147/EC. Furthermore, for new and refurbished buildings, the Promoter will ensure that the Project is implemented in line with EU Directive on Energy Performance of Buildings. In case of being applicable, the Project will have to comply with the requirement of the EU Water Framework Directive. Finally, the Project is expected to contribute to the Bank's Climate Action and Environmental Sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation, pollution prevention, and protection and restoration of biodiversity & ecosystems.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for implementation of the Project have been or will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

À l'examen - 30/07/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Aménagement urbain