Référence: 20250178
Date de publication: 7 juillet 2025

Promoteur – Intermédiaire Financier

INDEPENDENT POWER TRANSMISSION OPER

Lieu

Description

Electricity interconnection of the islands of Lemnos, Lesvos, Chios, Samos, and Skyros to the mainland transmission grid (via Nea Santa in the area of Thrace to the north, and via Aliveri in the Evia island to the east), and to the Dodecanese islands grid (via Mastichari in the Kos island to the south). The connection will be mainly established through alternating current (AC) 150 kV cable interconnectors and 150 kV gas insulated (GIS) substations.

Objectifs

The project contributes to the energy and climate policy objectives of the European Union and Greece. It is expected to eliminate the electrical isolation of the concerned islands, ensure a more efficient, reliable and clean electricity supply in comparison to the status quo (local diesel or high-fuel oil power stations), improve security of supply, increase the hosting capacity for connection of Renewable Energy Sources ("RES") in the region, contribute to the further economic development of the concerned islands, particularly via tourism.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 420 million

Coût total (montant approximatif)

EUR 1400 million

Aspects environnementaux

Most of the project components fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC Directives)

Passation des marchés

The EIB will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

À l'examen - 6/05/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Grèce Énergie