Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20250164
Date de publication: 3 septembre 2025

Promoteur – Intermédiaire Financier

ACQUE VERONESI SCARL

Lieu

Description

The project will finance part of the Promoter's investment programme in water supply, wastewater and stormwater management infrastructure during the period 2025 - 2029.

Objectifs

The aim is to support the Promoter's in providing integrated water services in 77 municipalities in the Province of Verona (Veneto Region). In particular, the project consists of numerous small to medium size investments to reduce water losses, increase water security, reduce flooding and protect the environment.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 60 million

Coût total (montant approximatif)

EUR 151 million

Aspects environnementaux

The environmental impact of the underlying investment components is minimal, with the principal effects occurring predominantly during the construction phase (noise, dust, traffic etc) and not normally requiring a full environmental and impact assessment (EIA). At this stage, none of the investments are expected to require a full Environmental Impact Assessment (EIA) under Directive 2014/52/EC amending Directive 2011/92/EC. The Project will not have an impact on Natura 2000 or other protected areas. The Promoter is required to comply with all relevant national and European legislation. Overall, the project is expected to bring substantial environmental quality improvements, notably in terms of higher ecological quality of surface and groundwater resources, as well as a more rational use of water resources and reinforcement of adaptation to extreme weather events, thereby increasing the resilience to potential effects of climate change.

Passation des marchés

The Promoter shall ensure that contracts for the implementation of the Project will be tendered in accordance with the applicable EU procurement legislation Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Eau, assainissement