Recherche Fr menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240645
Date de publication: 10 mars 2025

Promoteur – Intermédiaire Financier

DEPARTEMENT DE LA SOMME

Lieu

Description

The project will finance the construction and renovation of school infrastructure as well as the library and the administrative centre under the responsibility of the Somme Department in France. Transversal items such as the digital agenda for schools and accessibility is also part of the project.

Additionality and Impact

The renovated and upgraded infrastructure financed by the EIB will accelerate the modernisation of teaching and learning environments in terms of pedagogical appropriateness, quality, health and safety, digital preparedness and energy efficiency improving the provision of lower secondary education. The project will therefore help to address market failures in education by financing infrastructure that will promote positive externalities, including inclusive economic growth and increased knowledge, productivity, climate and environmental externalities.


The EIB's advice ensures the technical and economic quality of the investment through the disbursement conditions. Monitoring reports will ensure compliance with disbursement conditions and undertakings.


The long-term financing provided by the Bank will help to make the investment more profitable for the borrower and diversify its sources of finance. The possibility of obtaining a fixed rate over a long maturity, the deferred repayment period and the flexibility offered at drawdown are all factors that will make it possible to adapt/spread the debt costs.

Objectifs

The primary objective is to modernise and improve the school infrastructure to align the educational offerings with evolving local needs and improve the overall experience for students. Additionally, the project aims to increase the educational buildings energy efficiency and enhance their resilience against the impacts of climate change.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 45 million

Coût total (montant approximatif)

EUR 110 million

Aspects environnementaux

The project does not involve any new technologies or specific methodologies. All components will comply with current thermal regulations (RT2012 and RE2020 standards, depending on the date of issue of the building permit) which are the national transposition of EU Directives. For certain specific operations, the desired performances may go beyond the regulations. The Department will not seek to obtain specific environmental sustainability labels.

Passation des marchés

The promoter shall ensure that contracts for the implementation of the project are awarded in compliance with applicable EU legislation (in particular Directives 2014/24/EC and Directive 89/665/EEC) and the case law of the European Court of Justice, including the publication of procurement notices in the Official Journal of the EU, as required.

Statut

Signé - 12/05/2025

Milestone
À l'examen
Approuvé
Signé
15 avril 2025
12 mai 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

France Éducation