Recherche Fr menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240563
Date de publication: 13 mai 2025

Promoteur – Intermédiaire Financier

ARKEA BANQUE ENTREPRISES ET INSTITUTIONNELS

Lieu

Description

The project consists of an intermediated loan in support of small to mid-sized renewable energy projects in France, carried out by private entities.

Additionality and Impact

The present Framework Loan operation will support renewable energy investments (mainly solar photovoltaic) in France and will therefore contributing to the Climate Action & Environmental Sustainability.

The operation will generate energy savings and addresses negative climate and environmental externalities, a market failure, through the reduction of carbon emissions and other air pollution.

On project quality, the project is supported by adequate capabilities of the promoter. In terms of project results, the projects are expected to have a positive economic rate of return and are expected to generate a positive broader social benefit.

In addition, a transversal objective on improving access to finance in less developed and transition regions of France (EU cohesion area) is targeted considering the domestic and regional footprint on such areas of Credit Mutuel Arkea.

The EIB support to this operation is expected to accelerate and facilitate the implementation of the underlying Renewable Energy schemes, by lowering the associated cost of funding and offering a maturity beyond the tenor usually offered by commercial banks.


Objectifs

The aim is to finance small and mid-sized renewable energy projects (mainly commercial & industrial solar photovoltaic systems and onshore wind farms) carried out by private entities in France.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 300 million

Coût total (montant approximatif)

EUR 400 million

Aspects environnementaux

Final beneficiaries will be requested to comply with applicable national and EU legislation, as appropriate.

Passation des marchés

Final beneficiaries will be requested to comply with applicable national and EU legislation, as appropriate.

Statut

Signé - 22/05/2025

Milestone
À l'examen
Approuvé
Signé
20 mai 2025
22 mai 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

France Énergie