Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240352
Date de publication: 15 novembre 2024

Promoteur – Intermédiaire Financier

CAMARA MUNICIPAL DO PORTO

Lieu

Description

This Framework Loan will support the implementation of the investment programmes/plans of the City of Porto, which is in line with the urban development strategy objectives (Plano Diretor Municipal), as well as with relevant sectoral and climate strategies. The project comprises, among others, investments in urban renewal and regeneration, including social, cultural and sports facilities, open spaces and green areas, as well as sustainable mobility schemes.

Objectifs

The aim is to contribute to further develop the city of Porto and improve both its living and business conditions. The project will improve urban mobility and also foster economic development, considering the changes in demographic and economic conditions.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 200 million

Coût total (montant approximatif)

EUR 419 million

Aspects environnementaux

The compliance with the relevant EU Directives will be verified during appraisal: Directive 2011/92/EU as amended by the Environmental Impact Assessment (EIA) Directive 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. For new and refurbished buildings, the compliance with EU Directive 2010/31/EU on Energy Performance of Buildings will be further examined during appraisal. For schemes triggering art. 4.7 of the Water Framework Directive 2000/60/EC, the compliance with this WFD will be further examined during the appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation, pollution prevention, and protection and restoration of biodiversity & ecosystems. Finally, the project is expected to contribute to improve social inclusion, in particular through those schemes directly connected to mixed and integrated development as the ones on the social/affordable housing sector.

Passation des marchés

The EIB will require the promoter to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC] as interpreted by the EU Court of Justice, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 27/11/2024

Milestone
À l'examen
Approuvé
27 novembre 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Portugal Aménagement urbain