Date de publication: 6 mars 2025
Promoteur – Intermédiaire Financier
OMV PETROM SALieu
Description
The project portfolio consists of three solar photovoltaic plants (PV) with a combined capacity of 710 MW, located in Teleorman county, Romania.
Objectifs
This project will contribute to achieve both national and EU energy and decarbonisation objectives, as well as the EIB's lending policy on social cohesion, renewable energy and climate action. Being located in an EIB Cohesion Priority Region, it will also contribute to regional development. The revenues of the project will rely on commercial PPA(s) and sales on the wholesale market. The project thereby contributes to support market integration of renewable energy projects.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
not disclosed
Coût total (montant approximatif)
not disclosed
Aspects environnementaux
The individual plants and the ancillary infrastructure fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU (amended by the Directive 2014/52/EU), requiring the competent authorities to determine whether an EIA is required. The EIB will review the EIA screening process applicable to all three plants during appraisal. Impacts on the environment from PV plants are likely to stem from noise, dust and increased traffic during the construction phase and to visual and land use impacts during operation. The EIB will assess compliance with applicable EU Directives during appraisal, in particular concerning cumulative impacts and potential impacts on nature conservation sites. The Bank will also assess the capacity and capability of the promoter to implement the Project and its compliance with applicable EU Directives.
Passation des marchés
The Promoter has been assessed by the EIB as being a private entity and the PV plants will likely be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and subsequent 2014/25/EU, hence private sector procurement procedures are expected to apply. However, if during project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules.
Statut
À l'examen - 23/01/2025
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).