Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240228
Date de publication: 17 octobre 2025

Promoteur – Intermédiaire Financier

MAHARASHTRA METRO RAIL CORPORATION LTD

Lieu

Description

The project concerns the extensions of Metro Corridor 1 (PCMC to Swargate), of Pune Metro Rail Project (2016-0327) towards the North (PCMC-Nigdi) and the South (Swargate - Katraj). The extensions will be 10.5km long with 9 stations.

Objectifs

The project will contribute to two main objectives of the EIB External Mandate: (i) climate change mitigation, by promoting modal shift from road to rail and thereby a reduction of greenhouse gas emissions; (ii) enhancement of social and economic infrastructure, by making a key contribution to urban development, thereby improving the business environment to support the private sector and facilitate access to amenities and jobs. The project is in line with the EU Country Strategy Paper for India which highlights the infrastructure gap and need to address rising greenhouse gas emissions. It supports two main objectives of EIB External Mandate: (i) climate change mitigation, by promoting modal shift from road to rail while reducing greenhouse gas emissions, and (ii) social and economic infrastructure development, by contributing to urban development.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 235 million

Coût total (montant approximatif)

EUR 475 million

Aspects environnementaux

Metro rail systems in India are exempt from the Environmental Impact Assessment (EIA) procedure and prior environmental clearance under the EIA Notification Act, 2006. However, all necessary permits for tree felling, waste management, water use, and other construction-related activities will be obtained as required. Despite the absence of a legal obligation under the Indian law, the project has been subject to a full Environmental and Social Impact Assessment (ESIA) in line with the EIB's Environmental and Social Policy, and its compliance with applicable EIB’s Environmental and Social Standards will be further reviewed during appraisal.

Passation des marchés

The promoter has to ensure that the project implementation will be done in accordance with the EIB's Guide to Procurement.

Statut

À l'examen - 7/02/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Inde Transports