    Référence: 20240122
    Date de publication: 24 septembre 2024

    Promoteur – Intermédiaire Financier

    INDEPENDENT STATE OF PAPUA NEW GUINEA

    Lieu

    Description

    The project consists of the expansion of water supply services (WSS) to urban areas in Papua New Guinea, specifically to four provincial towns and the reduction of non-revenue water in the capital, Port Moresby.

    Objectifs

    Water PNG received support with this project to meet the national targets by 2030 for urban areas, namely provide 95% of the population with access to a safe, convenient and sustainable water supply. The non-revenue-water project component in Port Moresby will further reduce water loss and therefore improve the utility's revenues to sustain and support expansion into new district towns. The project will also contribute to achieving Sustainable Development Goals (6, 11 and 13).

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    USD 25 million (EUR 22 million)

    Coût total (montant approximatif)

    USD 39 million (EUR 35 million)

    Aspects environnementaux

    The Promoter will be required to implement and operate the investments in conformity with national laws, as well as the EIB's environmental and social standards. The project intends to bring environmental benefits by contributing to the protection of both surface water and groundwater bodies through improving the efficiency of the water supply infrastructure. Most of the schemes to be financed under the investment loan are expected to have limited adverse environmental and social impacts. Where a formal EIA is required, a copy of the Environmental & Social Impact Study or the Non-Technical Summary (NTS) or equivalent document will be provided to the Bank, and published on its website. The Promoter will also be required to verify that none of the schemes submitted for financing by the Bank have a significant negative impact on any site of nature conservation importance. The Promoter's capacity to ensure that the schemes are in compliance with the EIB's environmental and social standards will be also verified at appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation, sustainable use and protection of water and marine resources.

    Passation des marchés

    The Bank will require the Promoter to ensure that any procurement under the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    À l'examen - 17/05/2024

    Milestone
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Papouasie-Nouvelle-Guinée Eau, assainissement