Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    90 000 000 €
    Pays
    Secteur(s)
    France : 90 000 000 €
    Énergie : 90 000 000 €
    Date(s) de signature
    23/05/2025 : 90 000 000 €

    Fiche récapitulative

    Date de publication
    23 mai 2024
    Statut
    Référence
    Signé | 23/05/2025
    20230982
    Nom du projet
    Promoteur – Intermédiaire financier
    BORDEAUX METROPOLE ENERGIES II
    BORDEAUX METROPOLE ENERGIES
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 90 million
    EUR 123 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The Framework Loan to the 'Société d'Économie Mixte' (mixed-economy company) Bordeaux Métropole Energies (BME) and its majority-owned subsidiaries will support energy efficiency renovations of residential buildings, renewable energies (especially photovoltaic) and district heating/cooling networks in the Bordeaux metropolitan area until 2028. This is the second operation with BME after project 'Bordeaux Métropole Energies' 2017-0896.

    The aim is to contribute to the energy efficiency (EE) renovation of approximately 3,150 homes (370 individual housings and 2,780 apartments in condominiums). As a One-Stop Shop for EE renovations, BME will keep supporting - technically and financially - building owners in their renovations. Such activity is part of BME's role as third-party financing entity (Société de Tiers-Financement), following the French legal arrangements that allows non-banking entities to perform credit activities to individuals for EE renovations under clearly established conditions.

    Additionnalité et impact

    This Project supports the EU's and the EIB's priorities in the energy sector. It also contributes to the EIB's Climate Action objectives, through the implementation of Energy Efficiency ('EE') and Renewable Energy ('RE') sub-projects.

    The implementation of the EE sub-projects financed under this Operation will contribute to the achievement of France's 2021-2030 National Energy Climate Plan, which envisages ambitious targets for carbon emissions' abatement. In doing so, it supports the EU's and national targets for EE and contributes to the security of energy supply and environmental objectives. This Operation is fully aligned with the EU Energy Performance of Building Directive ('EPBD'), the Energy Efficiency Directive ('EED'), the Renewable Energy Directive and with REPowerEU.

    The Project addresses a number of market failures. Through energy savings, EE sub-projects reduce carbon emissions and air pollution, increase comfort and air quality in buildings, as well as social and public benefits that are not fully internalized by investors.

    In addition, the development of RE will be fully integrated in the urban area, by installing small-scale photovoltaic (PV) panels on roofs or by developing RE heat sources for District Heating with a share of RE above 80%.

    The Project will generate an excellent Economic Rate of Return (ERR) and has an excellent rated broader social benefit when integrating its extended building life. The Promoter has already a large experience in such sub-projects.

    The Project also contributes to the development of the EU energy sector in accordance with EU priorities; in particular with the generation, supply or use of clean and sustainable renewable energies, the promotion of EE and the support for energy savings (with a focus on reducing demand through demand-side management and the refurbishment of buildings).

    Finally, the EIB loan has features that other banks would not provide: an availability period of 4 years, a grace period of 3 years and a maturity of up to 20 years. The EIB loan will also help the Promoter/Borrower attracting public funds (including grants), homeowners' financing and commercial banks. In parallel, the Promoter/Borrower received an ELENA support itself and may implement PV and district heating projects from Bordeaux Métropole (its main shareholder) which are supported by ELENA.

    Aspects environnementaux
    Passation des marchés

    This project will generate various environmental benefits such as the reduction of energy consumption, climate change mitigation and adaptation solutions. Each sub-project will be of limited size and it negative environmental impact will be limited considering its size, location and technical nature.

    In most cases, EU Directives for Public Procurement are not applicable since the financed building works will be ordered and performed by private individuals (building owners of houses and apartments), being the project final beneficiaries. However, in the case of EE renovations and other activities related to public buildings as well as contracts between BME and artisans or other companies, EU Public Procurement rules will apply.

    Étapes
    À l'examen
    Approuvé
    Signé
    25 novembre 2024
    23 mai 2025

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - BORDEAUX METROPOLE ENERGIES II
    Date de publication
    3 Dec 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    224595284
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230982
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes