    Référence: 20230887
    Date de publication: 5 septembre 2024

    Promoteur – Intermédiaire Financier

    Not disclosed.

    Lieu

    Description

    The project consists of several planned investments in the Kiel district heating system, the main elements are: the installation of a large heat pump (50 MWth), a 1500 MWh heat storage tank; and the expansion and modernisation of the heat distribution network.

    Objectifs

    The programme's objectives are to maintain and expand the district heating systems and to substitute fossil-fuel based central heating with a more sustainable and efficient renewable generation (heat pump), resulting in a reduction of greenhouse gases emissions and lower air pollution.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    not disclosed

    Coût total (montant approximatif)

    not disclosed

    Aspects environnementaux

    The project is at early stages of development and certain features of the design to be developed in the future may trigger environmental impact assessment (EIA) processes for some investments once more information is available. The environmental aspects of the programme will be appropriately assessed as part of the EIB's appraisal process.

    Passation des marchés

    The promoter is a majority publicly-owned undertaking. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EU, and/or 2014/23/EU where applicable, as well as the Directive 92/13/EEC and/or Directive 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    À l'examen - 30/05/2024

    Milestone
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Énergie