Date de publication: 9 septembre 2024
Promoteur – Intermédiaire Financier
REPUBLICA PORTUGUESALieu
Description
Investments in the recovery and rehabilitation of existing 451 schools across Portugal.
Objectifs
The project's main objectives are to provide better learning conditions for primary and secondary students, by upgrading the public education infrastructure and equipment, and to adapt the school network to changes in the local demand.
Secteur(s)
- Éducation - Enseignement
Montant BEI envisagé (montant approximatif)
not disclosed
Coût total (montant approximatif)
not disclosed
Aspects environnementaux
Directive 2011/92/EU as amended by Directive 2014/52/EU on Environmental Impact Assessment (EIA) does not specifically cover educational activities, leaving it at the discretion of the responsible competent authorities to request an EIA on the basis of the location and scale of the works concerned. However, schools may fall under Annex II of EIA Directive 2011/92/EU with respect to urban development. Social and environmental aspects as well as any issues related to historical and cultural heritage will be verified during the appraisal. This includes verification of compliance with accessibility features for people with reduced mobility. The project will include new buildings and renovations, which will comply with the 2010/31/EU Directive on the energy performance of buildings and Directive 2012/27/EU on energy efficiency. The project will include investments located in less developed regions as defined by the EU cohesion policy. Therefore, the project is expected to support the strengthening of the EU's economic, social and territorial cohesion. Moreover, the Project will contribute to better-balanced territorial development, counteracting excessive concentration, strengthening secondary growth poles and reducing inequalities between people and between places. The Project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation, and sustainable use and protection of water and marine resources.
Passation des marchés
The Bank will require the Promoter to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
À l'examen - 6/02/2024
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).