Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    260 000 000 €
    Pays
    Secteur(s)
    Espagne : 260 000 000 €
    Eau, assainissement : 260 000 000 €
    Date(s) de signature
    25/09/2024 : 260 000 000 €

    Fiche récapitulative

    Date de publication
    8 mai 2024
    Statut
    Référence
    Signé | 25/09/2024
    20230839
    Nom du projet
    Promoteur – Intermédiaire financier
    CATALONIA WATER INFRASTRUCTURE
    GENERALITAT DE CATALUNYA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 260 million
    EUR 480 million
    Lieu
    Secteur(s)
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    Description
    Objectifs

    Catalonia Water Infrastructure aims to finance improvements and extension of existing water infrastructure to ensure quality water supply and resilience towards climate change (quality and water availability) in the province of Barcelona in the region of Catalonia in Spain.

    The operation concerns the main investments to be undertaken by the public entity, Ter-Llobregat Water Supply Body (ATL), in charge of upstream water intakes in the rivers Ter and Llobregat, its treatment, storage and supply to the downstream municipalities and utilities. The main project components are (i) Maintenance capital expenditures of the existence installations and the extension to new populations under scope (ii) doubling tranche IV of the main transport pipe from Ter to Trinitat (Barcelona) (iii) Upgrade of Ter Water Treatment Plant (WTP) (iv) Upgrade and extension of Abrera WTP. The project will be implemented in the province of Barcelona (ES511), a More Developed Region.

    Additionnalité et impact

    The operation concerns the main investments to be undertaken by the public entity Ens D'Abastament D'Aigua, in charge of upstream water intakes in the rivers Ter and Llobregat, its treatment, storage and supply to the downstream municipalities and utilities. The main Project components are: (i) Regular investments targeting the existing infrastructure and the extension to new populations under scope (ii) doubling partially the main transport pipeline from Ter to Trinitat (Barcelona) (iii) Upgrade of Ter Water Treatment Plant (iv) Upgrade and extension of Abrera Water Treatment Plant. The investments will be implemented in the province of Barcelona, region Catalonia (Spain).


    The operation is aligned with the Bank's Public Policy Goal: "Sustainable energy and natural resources", namely: "Water, wastewater and waste management". It is eligible under Article 309 (c ). The operation is aligned with the 2023 EIB Water Sector Orientation. It is expected to have 100% CAES contribution, with c. 93% Climate Action for Adaptation and 100% Water contribution in Environmental Sustainability. Sustainable Awareness Bonds contribution is 100%. The large Adaptation contribution enables the Bank to propose a loan above the usual percentage of 50% of the Project cost (requested 75%).


    No derogations from EIB policies are foreseen.

     

    The EIB financing addresses market failures concerning public goods provision (water) and climate externalities (adaptation), as well as access to finance and public health benefits (improved water quality), which would not be realised to the same extent without public intervention.


    The financing proposed offers features such as revisable rates and longer grace periods and tenors than available in the market at present.


    Aspects environnementaux
    Passation des marchés

    From the environmental perspective, no components require EIA, only component (ii) requires DIA (Declaración Integrada Ambiental). To be checked during appraisal. The project components will be aligned with relevant sectorial EU Directives: Water Framework Directive, EIA, Birds, Habitats, Biodiversity, Groundwater and Nitrates. The environmental and social impacts of the components are expected to be low. The actions to be implemented are included in the current River Basin Management Plan Conca Fluvial de Catalunya 2021-2027. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation and sustainable use and protection of water and marine resources.

    The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC] as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    26 juillet 2024
    25 septembre 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - CATALONIA WATER INFRASTRUCTURE
    Date de publication
    5 Dec 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    205899746
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230839
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes