Référence: 20230708
Date de publication: 20 novembre 2024

Promoteur – Intermédiaire Financier

PRINCIPALITY OF ANDORRA

Lieu

Description

The framework loan will support investments in electricity generation, transmission, distribution, district heating and cooling production and distribution in Andorra, in the period 2024-2028.

Objectifs

The aim is to support climate change mitigation beyond the EU borders. The project will improve the quality of electricity supply, develop district heating and enhance Andorra's electricity interconnection with Spain, while contributing to the national goal of achieving at least 33% of electricity demand supplied by national sources by 2030.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 60 million

Coût total (montant approximatif)

EUR 137 million

Aspects environnementaux

Some of the Project schemes in Andorra would have fallen under Annex I of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, requiring an Environmental Impact Assessment (EIA), and Annex II of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, requiring the competent national authority to determine the need for an EIA, if they were located within the EU. Schemes that have to do with digitalisation and refurbishment of assets are expected to have limited environmental impact. The Project scheme in Spain falls under Annex I of EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, requiring an EIA. The requirements and status of the permitting procedures will also be further assessed during appraisal. The appraisal will focus on the capacity and capability of the Promoter to implement the programme in line with EIB environmental and social standards and requirements.

Passation des marchés

The promoter has to ensure that implementation of the Project will be done in accordance with the EIB's Guide to Procurement.

Statut

À l'examen - 23/04/2024

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Andorre Énergie