Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20230707
    Date de publication: 2 octobre 2024

    Promoteur – Intermédiaire Financier

    FEDERAL REPUBLIC OF NIGERIA

    Lieu

    Description

    The project will implement a waterborne, urban and mass public transport network in Lagos, by developing water corridors and related facilities. More specifically, it concerns the purchase of fully electric small-scale vessels, the construction of new passenger stations and jetties, the establishment of inland water transport (IWT) operations as well as new maintenance facilities for the fleet.

    Objectifs

    The aim is to enhance the existing Lagos State IWT system, which is expected to play an increasing role in the local urban mobility. The project is consistent with the Lagos' 30-year development plan (2022-2052) which recognises that moving people by water is a unique asset and sustainable way of adapting the transport system to sea level rise. This is also also in line with the Lagos State Climate Action Plan (2020-2025) and Lagos Strategic Transport and Mobility Master Plan (2014-2032), which aims to increase the share of IWT in the total daily trips from less than 1% today to 8% by 2032.

    Secteur(s)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 170 million

    Coût total (montant approximatif)

    EUR 410 million

    Aspects environnementaux

    The project is expected to contribute to the EIB's climate action (mitigation and adaptation) and to environmental sustainability objectives. The EIB will require the Promoter to comply with the EIB Environmental and Social Standards.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    À l'examen - 24/09/2024

    Milestone
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Nigéria Transports