Référence: 20230611
Date de publication: 17 juin 2024

Promoteur – Intermédiaire Financier

ENEDIS

Lieu

Description

The project will finance ENEDIS's network transition and adaptation to climate change, in particular connections to new renewable energy units, including the network resilience and modernisation.

Objectifs

The aim is to support the investments needed to increase the renewable capacity and strengthen the network to make it more resilient to climate change.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 500 million

Coût total (montant approximatif)

EUR 1008 million

Aspects environnementaux

The project includes components that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), which requires the competent national authority to determine the need for an environmental impact assessment (EIA). The impacts that can be typically expected for some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC). The environmental and social due diligence will follow the programme lending approach according to the EIB's procedures and standards. It will focus on the Promoters' capacity to implement the project in line with EIB environmental and social standards and requirements.

Passation des marchés

The promoter has to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation Directive 2014/25/EU as well as Directive 92/13/EEC (amended by 2007/66/EU) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 2/08/2024

Milestone
À l'examen
Approuvé
Signé
18 décembre 2023
2 août 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

France Énergie