    Référence: 20230530
    Date de publication: 22 octobre 2024

    Promoteur – Intermédiaire Financier

    AUTORIDAD PORTUARIA DE BILBAO

    Lieu

    Description

    The loan will finance the expansion of the second phase of the Bilbao Port’s Central Pier (Espigón Central), including the development of onshore power supply network and renewable energy generation facilities within the port limits.

    Objectifs

    The aim is to provide additional port capacity and increase efficiency in the Trans-European Transport Network (TEN-T) network, which will reduce maritime transport costs, support the offshore renewable energy industry and provide the port with additional onshore power supply capacity as well as renewable energy sources.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    • Transports - Transports et entreposage

    Montant BEI envisagé (montant approximatif)

    EUR 80 million

    Coût total (montant approximatif)

    EUR 165 million

    Aspects environnementaux

    Two Environmental Impact Assessments (EIA) were already carried out in 2013. The Promoter was required to provide additional information to ensure the project's compliance with the Directive 2014/52/EU amending the EIA Directive 2011/92/EU, which will be further verified at appraisal. Compliance with the Water Framework Directive 2000/60/EC (as amended), the Floods Directive 2007/60/EC, the Habitats Directive 92/43/EEC and Birds Directive 2009/147/EC will also be further verified at appraisal.

    Passation des marchés

    The Promoter has to ensure that contracts for implementation of the Project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    À l'examen - 25/04/2024

    Milestone
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).