Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20230145
Date de publication: 30 juillet 2024

Promoteur – Intermédiaire Financier

AQABA WATER COMPANY,JORDAN WATER - MIYAHUNA LLC,WATER AUTHORITY,YARMOUK WATER LLC

Lieu

Description

The current Results-Based Loan (RBL) will finance small scale investments aiming to reduce Non-Revenue Water (NRW), increase water supply and improve sanitation services throughout Jordan.

Objectifs

The aim is to improve water security and climate adaptation, in line with the Government of Jordan's National Water Strategy, Non-Revenue Water Strategy and Financial Sustainability Roadmap by applying Results-based financing.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 450 million

Coût total (montant approximatif)

EUR 1000 million

Aspects environnementaux

The project will have a number of positive effects on the environment: (i) Improvement of potable water services throughout the country; (ii) Adaptation to climate change impacts by reducing water losses due to leakages and thus a reduction of non-revenue water; (iii) Adaptation to climate change impacts by providing valuable water for re-use in irrigation from the treated wastewater; (iv) Reduced energy consumption in the water supply system by increasing energy efficiency and reducing leakages of the water supply system. Inside the EU, the project components would be categorised under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by the Directive 2014/52/EU). The compliance with principles of relevant environmental EU legislation and EIB's Environmental & Social Standards as well as climate change aspects will be further examined during appraisal. The EIB will assess the social aspects of the project during appraisal to ensure adherence to its social standards.

Passation des marchés

The promoter shall ensure that the project implementation complies with the EIB's Guide to Procurement.

Statut

Signé - 18/07/2024

Milestone
À l'examen
Approuvé
Signé
13 décembre 2023
18 juillet 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Jordanie Eau, assainissement