Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220298
    Date de publication: 23 mai 2022

    Promoteur – Intermédiaire Financier

    IBERDROLA SA

    Lieu

    Description

    Financing of a multi-scheme 188 MW solar photovoltaic (PV) project in Portugal.

    Additionality and Impact

    The project increases renewable energy generation capacity in Portugal and contributes to national and EU 2030 climate objectives. Around 55% of the investment cost will be located in cohesion regions.

    The financing of this project also contributes to Bank's lending priority objectives on Renewable Energy Climate Action, Economic and Social Cohesion and Environmental Sustainability.

    The project produces electricity from low carbon sources (solar PV), thereby addressing the market failure of negative climate and environmental externalities through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).

    The operation has been awarded support under the auction-based 'General remuneration' scheme in 2019. The scheme guarantees grid access capacity and allows generators to sell the generated electricity for 15 years at the prevailing market price less a fixed contribution for each unit of electricity produced to the National Electricity System. Given the exposure to residual market risks, the projects contribute to the EU policy objective to support the market integration of renewable energy projects (RED II).

    The Bank's financial contribution is considered very good and valuable to the client, as the EIB's offering is more favourable than market alternatives under various dimensions (e.g. longer tenor, availability and grace periods, convertible or revisable rates). The promoter deems financing with an "EIB Green Loan" label as a stamp of quality on its investments and environment-related procedures and consistent with its green finance framework.

    Objectifs

    The present project entails the implementation and operation of five solar PV plants and their connection facilities with a total capacity of ca. 188 MWp. The PV plants will be located in the Portuguese regions of Algarve, Centro, Alentejo and Lisbon.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 70 million

    Coût total (montant approximatif)

    EUR 158 million

    Aspects environnementaux

    Iberdrola will be requested to comply with applicable national and EU legislation.

    Passation des marchés

    Iberdrola will be requested to comply with applicable national and EU legislation.

    Statut

    Signé - 19/12/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Portugal Énergie