    Référence: 20210737
    Date de publication: 30 mai 2022

    Promoteur – Intermédiaire Financier

    ELEKTROENERGIEN SISTEMEN OPERATOR EAD

    Lieu

    Description

    An investment loan to co-finance, alongside the Recovery and Resilience Facility (RRF), a multi-scheme investment programme for the digital transformation, rehabilitation and upgrade of Bulgaria's electricity transmission network from 2022 to 2026.

    Objectifs

    The programme is expected to improve the planning, operation, monitoring, control, maintenance and protection functions of the transmission network, increase its capacity, improve its flexibility, reliability, safety and security, and enable the integration of increasing amounts of renewable energy sources.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 118 million

    Coût total (montant approximatif)

    EUR 332 million

    Aspects environnementaux

    Some schemes fall under Annex II of Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected for these schemes relate to visual impact, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC).

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required

    Statut

    À l'examen - 10/05/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bulgarie Énergie