    Référence: 20210588
    Date de publication: 27 avril 2022

    Promoteur – Intermédiaire Financier

    ENEL GREEN POWER PERU SAC

    Lieu

    Description

    Allocation under the ENEL ENERGY EFFICIENCY & RENEWABLES FL supporting the development of renewable energy generation projects in Peru.

    Objectifs

    The project consists of the construction and operation of two renewable energy generation plants, in Peru. The 123 MW Clemesi Solar Photovoltaic project located in the Moquegua District (Moquegua Region); and the 165 MW extension of the operating Wayra Onshore Wind project located in the Marcona District (Ica Region); both projects being the extension of the Rubí Solar Power Plant and the Wayra I Wind Farm, respectively, currently in operation.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    USD 130 million (EUR 122 million)

    Coût total (montant approximatif)

    USD 260 million (EUR 244 million)

    Aspects environnementaux

    The project intends to generate environmental benefits by supporting new renewable energy generation plants that help to mitigate climate change. If the renewable energy plants were located within the EU they would fall under Annex II of the EIA Directive 2014/52/EU amending the Directive (2011/92/EU), requiring the competent authorities to determine whether an environmental impact assessment (EIA) is required. Following Peruvian national legislation, a full EIA is mandatory for such projects, and thus, it has been carried out by the Promoter. The processes and their conclusions will be assessed at appraisal. Compliance with the EIB's environmental and social standards and amongst others, the principles of relevant EU Directives, will be verified at appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    À l'examen - 27/04/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pérou Énergie