Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20210031
    Date de publication: 3 novembre 2022

    Promoteur – Intermédiaire Financier

    REPUBLICA PORTUGUESA

    Lieu

    Description

    The EIB loan will finance the 30-year Design-Build-Finance-Operate-Maintain (DBFOM) concession of Hospital de Lisboa Oriental (HLO). HLO is a new acute, specialist care and teaching 875-bed hospital to be built in Chelas, in the eastern part of the city. The project is part of the Ministry of Health's hospital modernisation and reconfiguration strategy across the Lisbon area and beyond.

    Objectifs

    The new hospital will largely substitute six existing hospitals located in the city centre and managed by one entity (Centro Hospitalar de Lisboa Central, EPE - CHLC). Since the project involves both the upgrade of health estate and improvement of service delivery, it falls under the EIB's primary objective "Innovation, digital and human capital" (Health). It is also eligible under Article 309 point (c) "common interest" and under Article 309 point (a) "EIB Cohesion Priority Region".

    Secteur(s)

    • Santé - Santé humaine et action sociale

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 410 million

    Aspects environnementaux

    Hospitals are not explicitly mentioned in the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by 2014/52/EU, though the project is covered by Annex II of the Directive concerning urban development. The compliance with requirements of the EIA Directive 2011/92/EU as amended by 2014/52/EU on EIA and Habitats Directive will be verified during appraisal. In line with Directive 2010/31/EU, the public building will have to meet at least the relevant national targets on energy efficiency. The energy performance of the hospital building will be verified during appraisal. The project will bring overall benefits to the community, as healthcare is an element of social cohesion and economic development.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in line with the relevant applicable EU procurement legislation (Directives 2014/24/EC and/or 2014/23/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The open tender for the HLO Management Contract was published in OJ/S S243, subsequently corrected by Notice No 2018/S 116-264386, OJ/S S116, 20.06.2018, by which the deadline for submission was extended.

    Statut

    Approuvé - 24/01/2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Portugal Santé