HRVATSKA ELEKTROPRIVREDA DDLieu
Description
The project will finance the construction and operation of one solar photovoltaic plant (PV) (~99 MWp).
Additionality and Impact
The solar PV Project will support the 2030 targets set out in the National Energy and Climate Plan of Croatia and the REPowerEU Action Plan.
The financing of this Project contributes to Bank's lending priority objectives on Decarbonising the Energy Supply (RES), as well as on Climate Action and Economic and Social Cohesion.
In terms of addressing market failures, the solar PV Project produces electricity from low carbon sources and thereby helps to address the market failure of negative environmental externalities, through the reduction of carbon and air pollution.
The Project is expected to rely on sales on the day-ahead market, or commercial power purchase agreements. Thereby the Project improves market efficiency and competition.
On project quality, the Project is supported by adequate capabilities / governance of the Promoter. In terms of project results, it is expected to have a positive economic rate of return, considering the economic value of the electricity generated. Therefore, the Project is expected to generate a positive broader social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost alternatives in Croatia.
The EIB's financial contribution stems from the Bank's capacity to provide long-term financing at favourable conditions which is substantially aligned with the long economic life of the assets to be financed.
Objectifs
The aim is to produce electricity from low carbon sources, reduce carbon emissions and air pollution (compared to fossil-fuel generation). By addressing the market failure of negative climate and environmental externalities, the project supports the EU and national renewable energy generation targets, REPowerEU Action Plan as well as the EIB's Climate Action and renewable energy objectives.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 44 million
Coût total (montant approximatif)
EUR 92 million
Aspects environnementaux
The solar PV including its ancillary facilities falls under Annex II of the Environmental Impact Assessment (EIA) EU Directive 2011/92/EU, as amended by Directive 2014/52/EU, requiring the competent authorities to determine whether an EIA is required. Competent authorities (Ministry of Environmental Protection and Energy), in Croatia, in October 2019, screened the project out from the requirement to carry out an EIA process.
Passation des marchés
The Promoter is a public entity operating in the utility sector and the Bank would normally require the contracts of the Project to be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. However, as this Project will be co-financed (by more than 50%) by EBRD, the Directive 2014/25/EU shall not apply to the contracts under this Project as per the Article 20.2 of the Directive. EBRD and EIB agree that the Promoter will implement the Project in accordance with the procurement rules and procedures of the EBRD.
Statut
Signé - 11/10/2024
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).