Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200725
    Date de publication: 28 octobre 2022

    Promoteur – Intermédiaire Financier

    MTN NIGERIA COMMUNICATIONS PLC

    Lieu

    Description

    The EIB will finance the upgrade of the promoter's 4G core mobile broadband network, as well as expand the radio network coverage from 90% to 98% of the population in the Lagos region.

    Additionality and Impact

    The project is aligned with the Cotonou (ACP-EC) partnership agreement from 2000 and addresses the specific market failure leading to under-investment in broadband network infrastructures in lower profitability areas, mainly due to low average revenue per user levels, combined, in the case of hard to reach areas, with high unit costs for the infrastructure. The project will not have relevant negative environmental and social impacts. On the other hand, the roll-out of the infrastructure will support the country's transition to a digital economy, resulting in significant positive social impacts through increased 4G coverage (fourth generation of mobile phone technology). Mobile communication technologies have been shown to enable positive environmental impacts related to climate change mitigation and adaptation in other sectors of the economy. The promoter and its main supplier for the project are reputable companies with high capacity,which ensures high quality and cyber-secure digital services. The sizeable hard currency loan provided by the European Investment Bank with a relatively long maturity and grace period will enable the promoter to secure equipment internationally in order to implement the Project in line with best practices.

    Objectifs

    The aim is to address the increased growth expected in mobile data applications, as well as the necessary upgrades in terms of capacity and functionality of the core network and business support systems. Thanks to the project, mobile broadband services will reach most of the remaining areas in the region that do not yet have access to the service.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 200 million

    Aspects environnementaux

    If it were located within the EU, the project would not require a mandatory Environmental Impact Assessment (EIA), as it does not fall under Annex I or II of the EIA Directive 2014/52/EU amending the Directive 2011/92/EU. Typically, the rollout of mobile telecommunication networks have limited environmental and social negative effects. Moreover, in this case the promoter will rely on existing mobile sites in which it will install new equipment. Full environmental and social details will be assessed during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 15/11/2021

    Milestone
    À l'examen
    Approuvé
    Signé
    17 juin 2021
    15 novembre 2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Nigéria Télécom