    Référence: 20200533
    Date de publication: 8 mars 2021

    Promoteur – Intermédiaire Financier

    REPUBLIC OF SLOVENIA

    Lieu

    Description

    Upgrade and modernisation of a rail track on the Maribor-Sentilj national border section.

    Objectifs

    The project comprises the modernisation and upgrade of the single-track railway section of about 18 km between Maribor and Sentilj (Austrian border) in order to close an existing gap on the Core Trans-European Transport Network (TEN-T) Baltic-Adriatic Corridor. The line is one of several important international freight connections. It connects Slovenia, including the main Slovenian port of Koper, and important international railway freight markets: Austria, Germany and Poland. The corridor also serves Croatia and the Western Balkans region. The project has been supported by JASPERS in the various project related aspects, e.g. demand analysis and train operation analysis. The contributions towards major stations layouts resulted in improved design for a more seamless operation of transport services.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 130 million

    Coût total (montant approximatif)

    EUR 260 million

    Aspects environnementaux

    The pertinence to Annexes I and II of the Environmental Impact Assessment (EIA) Directive, the screening decisions, the EIA and the development consents have been reviewed during the appraisal. The project's potential impact on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) was also appraised. A freight modal shift thanks to increased rail-based mobility can be expected (due to increased speed and increased capacity for freight and passenger services), thus also decreasing traffic-related greenhouse gas emissions and other externalities.

    Passation des marchés

    The EIB requires the Promoter to ensure that the contract for the implementation of the project has been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, 2014/25/EU and 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required .

    Statut

    Approuvé - 21/04/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovénie Transports