Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200375
Date de publication: 9 juillet 2020

Promoteur – Intermédiaire Financier

IBERDROLA SA

Lieu

Description

The project, financing the Puylobo onshore wind farm (48.5 MW) in the Spanish region of Aragon, consists of an allocation under the framework loan (FL) 2019-0811 IBERDROLA SPAIN GREEN ENERGY FRAMEWORK LOAN.

Objectifs

The operation will be key to increase electricity generation from renewable energy sources in Spain, in line with climate targets adopted for 2020, 2030 and 2050.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 29 million

Coût total (montant approximatif)

EUR 57 million

Aspects environnementaux

The project is included in Annex I of the Environmental Impact Assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), requiring full EIA, including public consultation. The project received its environmental permit in April 2019, for both the plant and the transmission line with no reported complaints.

Passation des marchés

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/23/EU / 2014/24/EU / 2014/25/EU, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/23/EU 2014/24/EU / 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Approuvé - 2/09/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Énergie