Recherche Fr menu Banque européenne d’investissement - Logo ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200208
    Date de publication: 27 octobre 2020

    Promoteur – Intermédiaire Financier

    BANKIA SA

    Description

    Private Finance for Energy Efficiency (PF4EE) Framework Loan (FL) for the financing of the energy renovation of existing buildings undertaken by homeowner associations in Spain.

    Objectifs

    The intermediated loan to Bankia will finance energy efficiency projects primarily promoted by homeowner associations located in Spain.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    • Industrie - Construction

    Montant BEI envisagé (montant approximatif)

    not disclosed

    Coût total (montant approximatif)

    EUR 40 million

    Aspects environnementaux

    This operation intends to bring environmental benefits by supporting projects that reduce energy consumption and help to mitigate climate change. The individual schemes to be financed are small and are expected to have very limited negative environmental impacts. Given the scale, location and nature of the sub-projects, an environmental impact assessment (EIA), as defined under the EIA Directive 2011/92/EU, is normally not required. The Bank has assessed the capacity and procedures of the Financial Intermediary to ensure compliance with national and European environmental and biodiversity regulations of the individual schemes as well as its capacity to support the Bank's Public Disclosure Policy, which aims at facilitating access by the public to environmentally relevant information.

    Passation des marchés

    Final beneficiaries will be requested to comply with applicable national and EU legislation, as appropriate.

    Statut

    Approuvé - 3/12/2020

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Énergie Industrie