Date de publication: 3 juillet 2020
Promoteur – Intermédiaire Financier
CITY OF POZNANLieu
Description
Financing of different investment projects carried out by the City of Poznan in the sectors of municipal transport, social facilities, roads and urban regeneration and different measures that are part of the Promoter's response to the COVID-19 crisis (including investment in healthcare infrastructure).
Objectifs
The proposed project is a standard framework loan to finance investments identified (and to be identified at a later stage) by the City of Poznan. Eligible schemes will involve sustainable urban transport investments (construction and modernisation of tramway lines and of municipal road infrastructure), as well as social infrastructure and different measures that are part of the Promoter's response to the COVID-19 crisis (including investment in healthcare infrastructure). For this reason, this operation is identified as a "COVID-19" immediate response operation.
Secteur(s)
- Transports - Transports et entreposage
- Services - Administration publique
- Santé - Santé humaine et action sociale
Montant BEI envisagé (montant approximatif)
PLN 600 million (EUR 131 million)
Coût total (montant approximatif)
PLN 1000 million (EUR 219 million)
Aspects environnementaux
The project includes multiple schemes, some of which may fall under Annex I or II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. For any scheme with a potential negative impact on a Natura 2000 area (falling under the Habitats Directive 92/43/EEC or Birds Directive 2009/147/EC respectively), the Bank requires the Promoter to act according to the provisions of the aforementioned directives as transposed into the national law. It is a general requirement that all schemes must be implemented in compliance with the EU environmental legislation. This will be addressed during appraisal for the concerned projects. The same principle applies for the refurbishment or construction of any buildings that may be included in any schemes forming part of the project: in this case, the Bank will require the Promoter to comply with the EU Directive on Energy Performance of Buildings.
Passation des marchés
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been or will be (depending on the progress of each scheme) tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/23/EU / 2014/24/EU or 2004/18/EC / 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Signé - 19/11/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).