    Référence: 20200034
    Date de publication: 6 septembre 2021

    Promoteur – Intermédiaire Financier

    ADIF ALTA VELOCIDAD

    Lieu

    Description

    The project consists of an extension of capacity of the Madrid railway node to serve traffic growth in the coming years. In particular, the project comprises several schemes for capacity expansion of the two Madrid main stations, Atocha and Chamartin, and other measures with the aim of operating them as one hub with two terminals. The project is located on the Core Trans-European Transport Network (TEN-T) Atlantic and Mediterranean Corridors.

    Objectifs

    The project will increase capacity of and reduce congestion in the Madrid railway node, and thereby allow the expected traffic growth in the high-speed lines converging in Madrid, as well as in the Madrid suburban railway lines.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 740 million

    Coût total (montant approximatif)

    EUR 1480 million

    Aspects environnementaux

    Some of the schemes included in the project fall under Annex I or II of the Environmental Impact Assessment Directive 2011/92/EU (as amended by Directive 2014/52/EU). The EIA, the screening decisions and the need for assessment according to the Habitants Directive 92/43/EEC will be analysed during the appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Approuvé - 17/11/2021

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Espagne Transports