The Structural Programme Loan will co-finance the flood protection and prevention programme in Poland.

Objectifs

The operation supports the Polish national government in the implementing their flood prevention, climate change adaptation, risk management and disaster resilience schemes under Specific Objective 2.4 of the Polish Government's European Funds for Infrastructure Programme, Climate and Environment 2021-2027 (Program Fundusze Europejskie na Infrastrukture, Klimat, Srodowisko 2021-2027). These sectors are also fully in line with Policy Objective 2 of EU Regulation (EU) 2021/1058 on European Regional Development Fund (ERDF) and the Cohesion Fund (CF) for the 2021-2027 programming period.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 200 million

Coût total (montant approximatif)

EUR 900 million

Aspects environnementaux

The river restoration schemes are expected to contribute to the overall improvement of the biodiversity of the flora and fauna. The drought management schemes are also expected to have a long term positive impact in terms of improving water resources availability. In general, it is foreseen that there will be temporary and reversible negative impacts during the implementation (construction) of the schemes. In case there are long term negative impacts, mitigation measures, as required by the competent environmental authorities, will be implemented. The project is expected to improve the adaptive capacity of the flood protection system across Poland against physical risks arising from climate change, primarily in the form of flood risk reduction and avoided flood damage. The Promoter will be required to act according to the provisions of the relevant EU Directives including, but not limited to the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by the Directive 2014/52/EU. The Promoter will also be required to ensure compliance of the project with the Water Framework Directive (2000/60/EC).

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU where applicable and/or 2014/25/EU where applicable, as well as Directive 92/13/EEC and/or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 5/02/2025

Milestone
À l'examen
Approuvé
5 février 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Eau, assainissement