    Référence: 20190405
    Date de publication: 14 octobre 2019

    Promoteur – Intermédiaire Financier

    PUBLIACQUA SPA

    Lieu

    Description

    The project will finance water and wastewater infrastructure in the Provinces of Arezzo, Firenze, Pistoia and Prato (Tuscany Region).

    Objectifs

    The purpose of the planned investments is twofold: (i) improving the efficiency of the drinking water supply system, while increasing its resilience to droughts and possible impacts of climate change (ii) eliminating the current situation of non-compliance with the Urban Wastewater Treatment Directive under the Infringement procedure n. 2014/2059. The Project also comprises investments in wastewater collection and treatment infrastructure in municipalities that do not fall under the aforementioned infringement procedure.

    Commentaires

    n/a

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 196 million

    Aspects environnementaux

    The project is expected to have positive net environmental and social impact, considering the focus on compliance. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the full text of the relevant EIAs on its website.

    Passation des marchés

    The EIB will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required.

    Statut

    Signé - 11/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.