Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190352
    Date de publication: 11 février 2020

    Promoteur – Intermédiaire Financier

    AUVERGNE NUMERIQUE

    Lieu

    Description

    The project relates to the roll-out of the second and third phases of a publicly owned fibre broadband network Public initiative network (PIN) in the Auvergne Region, covering the Départements Allier, Cantal, Puy de Dôme and Haute-Loire, France.

    Objectifs

    The objective of the project, to be implemented from beginning 2019 until the end of 2025, is to deploy a Fibre to the Home (FTTH) network covering around 257 000 homes, as well as a Fibre to the Enterprise (FTTE) network covering 3 400 small businesses and enterprises. The access network will be deployed in areas where private operators are not providing very high capacity broadband services due to lack of commercial interest and will therefore be commercialised on an open access basis to the private retail operators.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 403 million

    Aspects environnementaux

    Investments in fixed telecommunications projects (mainly civil works for fibre rollout) do not fall under the Annexes I & II of the EIA Directive 2014/52/EU amending the Directive 2011/92/EU. The related works have limited environmental effects, apart from disturbances during civil work constructions, which can be mitigated by appropriate measures.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/24/EU as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 10/06/2020

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    France Télécom