    Référence: 20190288
    Date de publication: 6 août 2019

    Promoteur – Intermédiaire Financier

    COMPANHIA DE SANEAMENTO DE MINAS GERAIS - COPASA MG

    Lieu

    Description

    The project will support COPASA's investment programme focusing on water and sanitation infrastructure.

    Objectifs

    This project will improve access to water and sanitation services in COPASA's area of operation. The purpose it is to achieve the objectives under the Brazilian National Plan for Basic Sanitation (2014), as well as the Sustainable Development Goals. It is estimated that the investment will be used for construction of new wastewater treatment plants (WTPs), expansion of services to unconnected customers, ensure service provision due to population growth, pumping stations and new required infrastructure.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 145 million

    Coût total (montant approximatif)

    EUR 291 million

    Aspects environnementaux

    COPASA will be required to implement and operate the investments in conformity with national laws, as well as EIB's environmental and social standards. Through wastewater treatment, the project will bring environmental benefits by reducing pollution in water bodies. Additionally, it will also mitigate climate change through the emissions reduction. Most of the individual investment schemes currently envisaged under this project are expected to have limited environmental and social impacts. Where a formal Environmental Impact Assessment (EIA) is required (or would be required, were the project located in the EU), a copy of the Environmental & Social Impact Study or the Non-Technical Summary (NTS) or equivalent document will be provided to the EIB and published on its website. The Promoter will also be required to verify that none of the schemes submitted for financing by the EIB have a significant negative impact on any site of nature conservation importance. COPASA's capacity to ensure that the schemes are in compliance with the EIB's environmental and social standards and the principles of relevant EU Directives will be also verified at appraisal. It is estimated that the investment will be used for construction of new wastewater treatment plants (WTPs), expansion of services to unconnected customers, ensure service provision due to population growth, pumping stations and new required infrastructure.

    Passation des marchés

    The EIB will require the promoter to ensure that implementation of the project will be done in accordance with the EIB Guide to Procurement.

    Statut

    Signé - 13/12/2019

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Brésil Eau, assainissement