Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190269
    Date de publication: 24 mars 2020

    Promoteur – Intermédiaire Financier

    STELLANTIS NV

    Lieu

    Description

    The project will finance the setup of production lines for the manufacturing of plug-in hybrid electric vehicles (PHEVs) at FCA's production plant in Melfi (Italy). It also includes the manufacturing of battery electric vehicles (BEV) at the promoter's plant in Mirafiori (Italy). The investments will be carried out in the period 2019-2021.

    Objectifs

    The project aims at supporting the promoter's investments for the manufacturing deployment of the most advanced vehicle powertrain electrification technologies.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 300 million

    Coût total (montant approximatif)

    EUR 614 million

    Aspects environnementaux

    The investments for the deployment of automotive assembly lines and equipment will take place in existing facilities without changing the already authorized scope of activity. Manufacturing and assembly of motor vehicles fall under Annex II of the Environmental Impact Assessment (EIA) directive 2014/52/EU amending the EIA Directive 2011/92/EU. The EIB will review during the project appraisal whether any of the investments require an EIA, and if so the status, as well as any other environmental details of the project. The implementation of this project is expected to contribute to the adoption of zero-emission and zero-emission capable vehicles and the deployment of a more sustainable transport system in Europe.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation, Directive 2014/24/EU, then the promoter will have to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/24/EU, as well as Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 18/03/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Industrie