Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190139
    Date de publication: 19 juin 2019

    Promoteur – Intermédiaire Financier

    ACCEPTABLE CORPORATE(S)

    Lieu

    Description

    The project consists of a platform to develop and operate 218-megavolt (MW) solar projects in Spain.

    Objectifs

    This project will enable the financing of a NewCo, the holding company owner of 100% of solar photovoltaic (SPV) projects under development. The NewCo will build and operate 22 solar photovoltaic projects with an aggregate capacity of 218MW in Spain. This NewCo will be funded with equity provided by im2 Energia Solar SL and a profit participating loan ("PPL") provided by the EIB.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 26 million

    Coût total (montant approximatif)

    EUR 185 million

    Aspects environnementaux

    Details of the promoter's environmental and social due diligence procedures for ensuring compliance with relevant EU and national regulation and the EIB's Environmental and Social Standards as well as the capacity of the promoter to assess and monitor environmental and social risks and impacts, will be reviewed during appraisal. The promoter will be required to develop an environmental and social policy and establish the appropriate management systems to comply with the environmental and social requirements of the Bank. The assessment of the environmental and social impacts and risks will be part of the standard due diligence process that the promoter will have to carry out for each underlying investment, thereby ensuring that the portfolio and these investments are in compliance with national law and in line with the principles and standards of relevant EU environmental legislation as well as the EIB Environmental and Social Standards.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions . However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (Directive 2014/23/EU / 2014/24/EU 2014/25/E), where applicable, then the Bank would require the promotor to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/23/EU /2014/24/EU / 2014/25/EU) where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 9/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Énergie