Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190133
    Date de publication: 15 juillet 2019

    Promoteur – Intermédiaire Financier

    REPUBLIC OF CROATIA

    Lieu

    Description

    The project concerns the modernisation and electrification of the single track, non-electrified railway line connecting Vinkovci and Vukovar (Vukovar-Srijem county) in Croatia. After a 18.7 km long reconstruction, the line will allow a maximum speed of 120 km/h exception made for urban areas.

    Objectifs

    The main objective is to improve the accessibility to and within the region of Eastern Slavonia, Croatia, by renewing and electrifying the railway line between Vinkovci and Vukovar which connects the Port of Vukovar (Core Network) on the Danube river, part of the Rhine-Danube Corridor Vll, to the main railway Corridor (X) line in Croatia.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 10 million

    Coût total (montant approximatif)

    EUR 77 million

    Aspects environnementaux

    The pertinence to Annexes I and II of the Environmental Impact Assessment (EIA) Directive, the screening decisions, the EIA and the development consents will be reviewed during the appraisal. The project's potential impact on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised. A modal shift thanks to increased rail-based mobility can be expected (due to increased speed and improved services), thus also decreasing traffic-related greenhouse gas emissions, although to a limited extent. Details will be checked during the appraisal.

    Passation des marchés

    The EIB will require the promoter to ensure that the contract for the implementation of the project has been or and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU and 2014/25/EU as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required. There are three publications in OJEU (2018/S 061-135680 on 28 March 2018, 2018/S 083-188471 on 28 Apri 2018 and 2019/S 088-212123 on 7 May 2019).

    Statut

    Approuvé - 18/11/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Croatie Transports