Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190032
    Date de publication: 26 juin 2020

    Promoteur – Intermédiaire Financier

    PUBLIC ENTITY(IES)

    Lieu

    Description

    The project concerns an allocation under SPL Romania EU CO-Financing for Environment 2014-20 (2015-0548) aiming to achieve compliance with the EU Drinking Water and Urban Wastewater Treatment Directives in the County of Cluj, Turda-Campia Turzii area.

    Objectifs

    The project will improve and extend the water supply and sanitation infrastructure in South East part of Cluj County (Campia Turzii area), within the Large Infrastructure Operational Programme 2014-2020, in order to accelerate the progress of complying with Romania's commitments in the EU Accession Treaty and bringing the sector in line with standards set by Directive 91/271/EEC and Directive 98/83/EC.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 17 million

    Coût total (montant approximatif)

    EUR 130 million

    Aspects environnementaux

    The project is expected to have a significant positive environmental and public health impact and contribute to meeting the country's need in the water and sanitation sector, in relation to compliance with EU environmental legislation.

    Passation des marchés

    The beneficiary (Regional Operating Company) has to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU) as and where required.

    Statut

    Approuvé - 2/09/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Eau, assainissement