Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190015
    Date de publication: 12 février 2020

    Promoteur – Intermédiaire Financier

    AZIENDA VENEZIANA DELLA MOBILITA SPA

    Lieu

    Description

    The project includes the replacement of 253 old buses with 208 new ones, including 30 electric buses and associated infrastructure as well as the acquisition of 27 new vessels and retrofitting of 15 existing vessels to a hybrid diesel-electric propulsion and replacement of floating berths (45 new pontoons and 91 new footbridges). These investments will be complemented by the upgrading and integration of the ticketing system. The investment plan aims to improve the operational resilience of the public transport fleet, maintain public transport share and reduce emissions by gradually transitioning towards less polluting alternatives.

    Objectifs

    The project aims to have a positive environmental impact by contributing to the reduction of greenhouse gas emissions particularly through the replacement of the most pollutant parts of the public transport fleet with alternative and clean fuels. In addition, the project is expected to maintain and/or increase public transport mode share in Venice through gradual replacement of the old fleet. The project therefore contributes to sustainable transport and climate change mitigation, in line with the EIB's Transport Lending Policy and the EU's and EIB's objectives on Climate Action.

    Commentaires

    n/a

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 60 million

    Coût total (montant approximatif)

    EUR 146 million

    Aspects environnementaux

    Fleet renewal together with electric charging infrastructure for buses and investment in associated infrastructure and equipment for inland navigation are not specifically mentioned in the EIA Directive 2011/92/EU amended by Directive 2014/52/EU. These works could be classified under Annex II; therefore, it is up to the competent authority in the Member State to determine whether or not the project is required to develop an environmental impact assessment. This will be further investigated at appraisal stage and, where required, the opinion of the competent authority will be requested. In addition, the applicability of the Water Framework Directive will also be assessed.

    Passation des marchés

    AVM Holding is a public company operating passengers transport by bus, inland waterways and tram in Venice. Its capability to implement the project will be further reviewed during appraisal. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU) with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 29/10/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Transports