Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180901
    Date de publication: 26 juin 2019

    Promoteur – Intermédiaire Financier

    EMPRESA MUNICIPAL DE VIVIENDA, SUELO Y EQUIPAMIENTOS DE SEVILLA SA

    Lieu

    Description

    The project consists of the construction of 562 social housing units for rent in Sevilla in Spain.

    Objectifs

    The operation aims to contribute to the provision of newly-built social and affordable housing for rent in the city of Sevilla, which is expected to improve the quality of life of the most vulnerable groups of society particularly those in the lowest-income brackets and is expected to promote greater social inclusion. The project is therefore eligible under Article 309 point (a) projects for developing less developed regions and point (c) common interest.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 81 million

    Aspects environnementaux

    It is foreseen that the operation's environmental impact at the construction stage will be short-lived and reversible, and at a level deemed acceptable. Some of the expected negative effects include traffic and dust during construction, which will be alleviated by appropriate site organization and construction management. The construction of the new social and affordable housing units will meet good environmental standards and will contribute to maintain and improve the quality of the built environment. Spain, as an EU Member State, has harmonized its environmental legislation with the relevant EU Directives: the Environmental Impact Assessment (EIA) Directive 2014/53/EU amending the 2011/92/EU, the Strategic Environmental Assessment (SEA) Directive 2001/42/EC and the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC and Energy Performance of Buildings Directive 2010/31/EU. None of the project components, given their size and nature, will require an EIA. The project does not require a SEA per se as the entire project is part of a General Urban Plan, which has undergone a SEA. None of the project components will be located inside or near a Natura 2000 area and there will be no impacts on any protected site. After completion of works, new buildings and refurbished buildings will contribute to reduce the energy consumption and pollutant emissions compared to the business-as-usual scenario (in compliance with the current regulation). After completion of works, new buildings and refurbished buildings will contribute to reduce the energy consumption and pollutant emissions compared to the business-as-usual scenario (in compliance with the current regulation).

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU /2014/24/EU, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 27/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Aménagement urbain